
Add to Cart
Name: Ellen wang Email: ellen@tobo-group.com
Skype:ellen.tobo5588917
Elbow, Reducer, Tee, Cross, Flange, Bend, Pipe cap, Pipe |
|
Reducer Type |
Seamless reducer;Welded reducer; Concentric reducer;Eccentric reducer; butt welding reducer;forged reducer; forging reducer;welding reducer; |
Standard |
ASME/ANSI B16.9, ANSI/ASME B16.11, ANSI/ASME B16.5; JIS B2311,JIS B2312,JIS B2313,JIS B2316; MSS SP-43, MSS SP-95, MSS SP-75, MSS SP-79; ISO 3419,ISO 5251,DIN 2616 SY/T 0510, SH 3408, SH3410 |
Size |
1/2'' ~ 48''(Seamless); 16'' ~72''(welded); DN15-DN1200 |
Wall thickness |
Sch5~Sch160XXS |
Manufacturing process |
Push, Press, Forge, Cast, etc. |
Material |
Carbon steel reducer, stainless steel reducer, alloy steel reducer |
Nickel Alloy steel |
Alloy 200/Nickel 200/N02200/2.4066; Alloy 201/Nickel 201/N02201/2.4068; Alloy 400/Monel 400/N04400/NS111/2.4360; Alloy K-500/Monel K-500/N05500/2.4375; Alloy 600/Inconel 600/N06600/NS333/2.4816; Alloy 601/Inconel 601/N06601/2.4851; Alloy 625/Inconel 625/N06625/NS336/2.4856; Alloy 718/Inconel 718/N07718/GH169/GH4169/2.4668; Alloy 800/Incoloy 800/N08800/1.4876; Alloy 800H/Incoloy 800H/N08810/1.4876; Alloy 800HT/Incoloy 800HT/N08811/NS112/1.4876; Alloy 825/Incoloy 825/N08825/2.4858; Alloy 925/Incoloy 925/N09925; Alloy C-276/Hastelloy C-276/N10276/2.4819; Alloy C-4/Hastelloy C-4/N06455/NS335/2.4610; Alloy C-22/Hastelloy C-22/N06022/2.4602; Alloy 2000/Hastelloy C-2000/N06200/2.4675; Alloy B/Hastelloy B/NS321; Alloy B-2/Hastelloy B-2/N10665/NS322/2.4617; Alloy B-3/Hastelloy B-3/N10675/2.4600; Alloy X/HASTELLOY-X/N06002/2.4465; Alloy G-30/HASTELLOY G-30/N06030/2.4603; Alloy C-2000/HASTELLOY C-2000/N06200; Alloy X-750/INCONEL X-750/N07750/GH145/2.4669; Alloy 20/Carpenter 20Cb3/N08020/NS312/2.4660; Alloy 31/N08031/1.4562;Alloy 901/N09901/1.4898; Incoloy25-6Mo/N08925; Inconel 783;Alloy-6XN/N08367;Monel 30C |
Other steel Duplex steel |
ASTM A182 F51/SAF 2205/UNS S31803, F5, F11,F22, F53/SAF 2507/UNS S32750, F91 |
Packing |
Wooden cases, pallets, nylon bags or according to the customers' requirements |
MOQ |
1pcs |
Delivery time |
10-100 days depending on quantity |
Payment terms |
L/C,T/T |
Shipment |
FOB Tianjin/Shanghai, CIF, CFR, etc |
Application |
Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
Remarks |
Other materials and drawings are available. |